Updated Architectural Renderings

July 9th, 2021

The Veritas Foundation received an updated 3D rendering of new projects the Blind School hopes to accomplish with our help. We also received a bid from P.E.A.S. Enterprises (a wonderful team of workers in Sierra Leone who built the new kitchen for the Blind School last year!) for roughly $31,000. Funding for this project will accomplish the following:

  • Introduce drainage channels to direct heavy rainwater away from buildings and play areas
  • Pave the grounds and provide “carpet grass” (artificial turf) so the children can play soccer
  • Build a covered walkway and sidewalks so the children can walk around the grounds without getting wet during the rainy season
  • Purchase a generator and build a generator storage room so the staff (some of whom are not blind) can see in the evenings
  • Build a storage room with a freezer so the school can preserve perishable food items
  • Construct a laundry room with sinks so the children can wash their hands and brush their teeth
  • Develop a covered area so the children can hang their clothes out to dry
  • Provide resources to dig the well deeper and finish constructing the water tower (including installing a second one) so the children can have running water

 

This updated plan will also accomplish:

  • Grading the compound 
  • Tiling the floor in the main classroom
  • Purchasing a new freezer
  • Installing new lights and electrical wiring

 

Please let us know if you would like to help us support the Blind School with their plans!

Background Information

The Blind School currently has the following buildings already constructed:

  • Bathrooms (bottom left)
  • Dormitories (top left)
  • Classrooms (top right)
  • Mohammed’s house (right)
  • Dining hall (bottom middle – left half)
  • Kitchen (bottom middle – right half with the shiny new roof – thank you for your support in helping us build a new kitchen for the school!)